It's so great to see a lot of progress being made!
The masons arrived on Monday morning and had to sweep about two inches of water off of the basement floor before they could start working. Then the trucks came with their loads of cement blocks.
This was after one day's work! There was a crew of ten working on erecting the block walls.
Driftwood along Lake Michigan beach. The zebra mussels are piled up six inches deep in places!
No comments:
Post a Comment