Nancy and I are hunkered down at the house again tonight. I thought it would be easier to dig out than to dig in in the morning in case we do get a big snow. Anyway we are tiling the fourth bathroom and will get it done tomorrow. Here are some pictures of Mike's artistry...
Mike trimmed out the stairs and added the railing. All of the caps were made from oak veneered plywood and built up from scratch.
Trim from plywood and capped with rabbet molding.
The closet doors were hung and trimmed out withh 1x2 extension jambs behind the casing.
Mike had all of the windows trimmed out the last time he was here.
This is my computer station and office at Wheeler Road. Pretty soon we hope to have all of the hardwood flooring on the floor where it belongs.